Black Friday: 60% off Astrolinks Pro for a whole year, until 1 December. More
Astrolinks

Hubstaff activity level: how the percentage is worked out and what it really tells you

Hubstaff activity level explained: the per-second formula, why calls and reading score low, idle time, and what managers should look at instead.

Mac and Windows. 7 days of Pro free, no card.

A man in a checked shirt reading a book at a wooden table, his laptop open beside him
Photo: StockSnap on Pixabay

Short answer

Your Hubstaff activity level is the share of seconds, in each 10-minute block of tracked time, that had any keyboard or mouse input. Hubstaff divides active seconds by 600. It doesn't record which keys you press. Reading, calls and thinking score low, and Hubstaff itself discourages quotas or scoring based on activity.

Astrolinks tracks work by client with no screenshots or keystroke logging, and the log stays on your computer. Get it free →

Your Hubstaff activity level is the share of seconds in each 10-minute block where your keyboard or mouse was used, shown as a percentage. It counts that there was input, not what you typed, so reading, calls and thinking score low even when they are the most important work of the day. Hubstaff itself says not to use it as a score or a quota.

This guide is for both sides of the dashboard. If you run an agency or a remote team, it shows what the number can and can't tell you, and what to look at instead. If you're the person being tracked, it explains why your percentage looks the way it does and how to talk about it. Every Hubstaff fact here comes from Hubstaff's own help center, linked as we go, and was checked in November 2026. Settings change, so confirm anything important in your own organization's settings.

How is Hubstaff activity calculated?

Hubstaff explains the formula in its article on how activity levels are calculated. The desktop app looks at every second of tracked time:

  • A mouse movement, click, scroll or key press marks that second as active.
  • No keyboard or mouse input marks it as inactive.

Then, for each 10-minute block:

Active seconds ÷ 600 = activity percentage

So if you touched the keyboard or mouse in 300 of the 600 seconds, that block shows 50%. Pressing one key in a second counts the same as typing a whole sentence in it. Hubstaff says it doesn't store keystrokes or where you clicked, only that there was some activity during that second.

A few details from the same article that change the number:

  • Trackpads count as a mouse. Touchscreen taps may produce lower percentages, because the movement between taps isn't recorded.
  • Some time is left out entirely. Manual time, breaks, time tracked on the mobile apps or web timer, and projects where activity recording is switched off aren't part of the calculation.
  • Idle time pulls it down. If idle time is kept, those seconds count as tracked with no input.

Hubstaff's article explains the 10-minute calculation. It doesn't spell out exactly how longer periods are averaged, so the daily example below uses simple arithmetic: total active seconds divided by total tracked seconds.

Why do reading, calls and thinking score low?

Because the formula only sees hands on the keyboard and mouse. Hubstaff says this itself: jobs with data entry, design and development tend to have higher averages, while people who spend more time in meetings, research or video calls tend to have lower ones.

Here's a made-up but realistic two-hour morning for an account manager at an agency. The active seconds are illustrative, not measured.

Task Time 10-minute blocks Active seconds per block Activity %
Reading a client's 12-page brief 20 min 2 90 15%
30-minute client call, a few notes 30 min 3 60 10%
Writing the proposal draft 40 min 4 420 70%
Design review in Figma with comments 30 min 3 300 50%
Morning total 2 hours 12 2,940 of 7,200 about 41%

The two tasks that decided the whole project, understanding the brief and agreeing the scope on the call, are the two lowest numbers on the page. The proposal draft scores highest, but it only exists because of the reading and the call.

The same pattern shows up for anyone whose work involves:

  • reading contracts, specs, code reviews or research
  • calls, interviews, onboarding and training
  • planning on paper or a whiteboard
  • watching a video walkthrough or a recorded bug

None of that is idle. It's just quiet on the keyboard.

What is a good Hubstaff activity level?

Hubstaff doesn't define a "good" activity level, and we couldn't find a Hubstaff page that sets a target number. What its help center does say:

  • Activity rates vary widely by role.
  • A team whose day involves email, reading and calls might average around 50%.
  • People at 75% and people at 25% can often both be working productively.
  • Hubstaff discourages quotas or scoring based on activity rates, and recommends looking at activity as a trend rather than a one-time snapshot.

You'll find other numbers in forums and blog posts, often a range someone's client asked for. Treat those as anecdotal. They describe one team's expectations, not a standard, and they mean little without knowing the role.

For a manager, the useful question isn't "is 45% good?" It's "has this person's pattern changed, and is their work getting done?" A designer who usually sits at 60% and suddenly drops to 20% for a week might be stuck, unwell or buried in meetings. A writer who is always at 35% and ships on time is fine.

How does idle time affect your Hubstaff activity level?

Idle time is separate from activity, but the two interact. Hubstaff's idle timeout article says that when the setting is on Prompt, a window appears after a period with no input (every 5 minutes by default) saying "You have been idle for X minutes." From there you can:

  • Keep the idle time, adding it to the current project.
  • Reassign it to a different project.
  • Discard it, so tracking continues and the idle time is removed.
  • Stop the timer.

The organization can set the timeout to 5, 10 or 20 minutes, a custom interval or never. Note that Hubstaff's own pages differ here: the activity article mentions 20 minutes of inactivity triggering an idle status, while the idle timeout article gives 5 minutes as the default. Check what your organization has set.

Other points worth knowing:

  • The idle timeout works in the desktop app and Chrome extension, not the web timer or mobile app, and Hubstaff says it's available on Grow plans and up.
  • Hubstaff's plans page lists custom idle timeouts and auto-discard on the Team and Enterprise plans.
  • If you keep idle time, your activity percentage drops, because those seconds had no input.

If you were on a call and the idle prompt appears, keeping the time is honest: you were working. Just expect that block to show a low percentage, and say so if anyone asks.

A smiling woman on a video call with four colleagues on her laptop at a desk by a window
Photo: PixelWanderer on Pixabay

What does activity % tell a manager, and what doesn't it?

Activity percentage is a narrow measurement. It's useful for a few things and misleading for most of what managers actually want to know.

It can tell you It can't tell you
Whether a keyboard or mouse was used during tracked time Whether the work was good, finished or useful
A rough pattern over weeks for one person in one role How two people in different roles compare
That someone may have left the timer running while away What happened on a call, in a document or in someone's head
That a role is call-heavy or reading-heavy Whether a low week was a problem or a hard problem being solved

Hubstaff's own list of common causes of low activity is a good reminder of how much noise is in the number: meetings, faulty keyboards or mice, idle time that was kept, and very short tracked blocks that don't reflect the whole day.

If you want more on the screenshot side of Hubstaff, including blur and who can delete what, our guide to Hubstaff screenshots covers it. It has a short activity section. This post goes deeper on the number itself.

What should managers look at instead of activity percentage?

Look at the work. For most agencies and remote teams, three things answer the real question better than any percentage:

  1. Finished work. Tasks closed, drafts delivered, tickets resolved, client feedback handled. This is what clients pay for.
  2. A short daily written report. What got done, what's in progress, what's blocked, what's next, and hours per client. It takes a minute to read and catches problems a percentage hides, like someone stuck waiting on a client.
  3. A regular conversation about trends. If you keep Hubstaff, use activity the way Hubstaff suggests: as a trend that starts a conversation, never as a grade.

If your team keeps Hubstaff, a few setup choices make the number fairer:

  • Separate call-heavy work. Hubstaff says projects with activity recording turned off aren't included in the calculation. An admin can set up a meetings or calls project that way, so client calls stop dragging percentages down.
  • Compare people to themselves. Never rank a designer's percentage against an account manager's.
  • Write it down. Tell the team in writing that activity isn't a target. Hubstaff's own guidance backs you up.

What should you do about a low Hubstaff activity level?

If you're the one being tracked and your number looks low, don't panic and don't try to inflate it. Gaming the score breaks the agreement you made, and it usually gets noticed. A calm explanation backed by finished work almost always lands better.

First, check the obvious causes from Hubstaff's list:

  • Kept idle time. Did you keep idle time during a call or while reading? That's honest, but it explains the dip.
  • Hardware. A sticky key or a mouse that drops out can lower the count.
  • Short blocks. A 3-minute tracked block can show an odd percentage that doesn't reflect your day.
  • The kind of work. Look at what you were doing in the low blocks. Usually it's reading, calls or planning.

Then talk to your manager or client before they bring it up. Here's a message you can adapt:

Hi Sam, quick note on my Hubstaff activity for Tuesday, which shows around 38%. Most of that afternoon was the onboarding call with the new client and reading their brand guidelines, which doesn't involve much typing. Here's what I finished that day: the homepage copy draft, the reply to their feedback on the logo, and the content calendar for January. If it helps, I can send a short end-of-day note with what's done, what's next and anything blocked, so you have the full picture next to the numbers. Happy to talk it through.

If your manager is treating the number as a target, it's fair to share Hubstaff's own line that it discourages quotas or scoring based on activity, with the link above.

If you're a manager who wants to know what got done rather than how busy the keyboard was, a daily report does that job. Astrolinks is one option: a desktop app for Mac and Windows that keeps a private log of which app and window each person is in, on their own computer, sorts the day by client and drafts their end-of-day report at clock-out. They review it and send it. It takes no screenshots, records no keystrokes and has no activity score. It's honest to say what it isn't: it has no mobile app, GPS or payroll, and it can't replace Upwork's tracker on Upwork hourly contracts. You can see what a manager receives in the sample report.

Keep reading

Let the report write itself

Astrolinks keeps a private log of your workday on your Mac and Windows and writes each client’s end-of-day report when you clock out. You check it and send. 7 days of Pro to start, no card.

Questions

How is Hubstaff activity calculated?

Hubstaff marks each second of tracked time as active if there was any keyboard or mouse input, and inactive if there wasn't. For each 10-minute block it divides the active seconds by 600 to get the activity percentage. It records that there was input, not which keys you pressed.

What is a good Hubstaff activity level?

Hubstaff doesn't define one. Its help center says rates vary widely by job, gives an example of a mixed day averaging around 50%, and says people at 75% and at 25% can both be working productively. Numbers quoted in forums are anecdotal.

Why is my Hubstaff activity low?

Usually because the work needs little typing or mouse movement: calls, reading, research and planning. Hubstaff also lists kept idle time, faulty keyboards or mice and very short tracked blocks as common causes of low percentages.

Does idle time lower the Hubstaff activity percentage?

Yes. Hubstaff says time tracked as idle lowers the activity percentage, because no input was recorded. When the idle prompt appears, you can keep the idle time, assign it to another project or discard it, depending on your organization's settings.

Does Hubstaff count activity on the mobile app?

No. Hubstaff says the mobile apps and the web timer can't record activity, so that time isn't included in activity calculations. Manual time, breaks and projects with activity recording turned off are left out too.

Clock out with the report already written

7 days of Pro to start. No card. Your log stays on your computer.