Short answer
A daily standup template is a short, fixed set of prompts each person answers every day, usually: what I did yesterday, what I'll do today, and what's blocking me. Copy one of the five templates below, paste it into Slack, a doc or your meeting notes, and keep each answer to two or three lines.
Astrolinks gives each person a daily report written from their own private log. No screenshots. Get it free →
A daily standup is meant to be the shortest meeting of the day. In practice, a lot of them drift into 40-minute status readouts where half the room waits for their turn. A good daily standup template fixes most of that by keeping everyone's answers short, the same shape, and focused on what actually needs a teammate.
Below are five standup templates you can copy as they are: the classic three questions, an async standup template for Slack, an engineering version, one for non-technical teams, and a blockers-first format. After that, you'll find how to run a live standup in 15 minutes and how to choose between live and async.
What is a daily standup template?
A daily standup template is a fixed set of prompts each person answers every day. Everyone uses the same headings, so updates are quick to give and quick to scan. The classic version has three prompts: yesterday, today and blockers.
The template is the easy part. What makes it work is the rule behind it: each answer is two or three lines, and anything that needs discussion moves to after the standup.
Template 1: The classic three questions
This is the standup template most teams start with. It works for any team that shares a goal and roughly the same hours.
Yesterday: what I finished or moved forward
Today: what I'm working on next
Blockers: anything stopping me, and who could help
Example:
Yesterday: Finished the onboarding email sequence draft. Reviewed Priya's landing page copy.
Today: Set up the sequence in the email tool and test it on two accounts.
Blockers: Need the final logo file from design. Ana, can you send it by noon?
Notice the blocker names a person and a time. "Waiting on design" is a complaint. "Ana, can you send it by noon?" is a request someone can act on.
Template 2: Async standup template for Slack
When your team spans time zones, an async standup template replaces the call with a written post. Each person posts at the start of their day in a shared channel, and teammates read when they come online.
:sunrise: Standup for [date]
Done since last update:
-
Focus today:
-
Blocked / need help:
-
Heads-up (optional):
-
Tips that keep async standups useful:
- Same channel, same time window. For example, "post within your first hour."
- Use a thread for replies. It keeps the channel readable.
- Tag the person who can clear a blocker, so it doesn't get lost.
- React when you've read it. A quick checkmark tells the writer someone saw it.
Some teams prefer to post at the end of the day instead, so the update reflects what really happened rather than what was planned. We compare the two in daily standup vs. EOD report, and our guide to async check-ins for remote teams covers time zones and rollout.
Template 3: Engineering standup template
Developers usually need a bit more structure: links to tickets, what's in review, and what's waiting on someone else. This version follows the board, not the person.
Shipped / merged: ticket links
In progress: ticket and expected finish
In review, needs eyes: pull request links
Blocked: what, by whom, since when
Sprint goal check: on track, at risk, or off track
Example:
Shipped / merged: APP-412 password reset fix.
In progress: APP-419 rate limiting on the login endpoint, done tomorrow.
In review, needs eyes: PR #881 (small, 40 lines).
Blocked: APP-423 needs the staging database refreshed. Waiting on ops since Tuesday.
Sprint goal check: At risk if APP-423 isn't unblocked by Thursday.
The "Sprint goal check" line matters. The current Scrum Guide describes the Daily Scrum as a 15-minute event for developers to inspect progress toward the Sprint Goal and adapt the plan. It doesn't require the three questions at all: teams can pick whatever structure they like, as long as the focus stays on the goal. This template keeps that focus in every update.
Template 4: Standup template for non-technical teams
Marketing, support, operations and admin teams don't work in sprints, so "sprint goal" means nothing to them. This daily scrum template swaps tickets for priorities and deadlines.
Top priority today: one thing that must get done
Also on my list: two or three smaller tasks
Deadlines this week: anything due, with the day
Need from someone: a decision, a file, an approval
Example:
Top priority today: Send the November newsletter to the full list.
Also on my list: Reply to 12 support tickets. Update the pricing FAQ.
Deadlines this week: Webinar slides to Marco by Thursday.
Need from someone: Sign-off on the newsletter subject line from Jen by 11 AM.
Leading with one top priority stops the update from turning into a long to-do list nobody reads.

Template 5: Blockers-first standup
When a team keeps missing deadlines because problems surface late, flip the order. Put blockers first, and only then the rest.
Blocked or at risk: what, and who can help
Done: one line
Next: one line
Run it like this: go round the room or channel and collect only blockers first. Assign an owner to each. Then, if there's time left, do a quick round of done and next. Often there isn't time left, and that's fine. Blockers are the reason the standup exists.
This format also suits a team that already sends written end-of-day updates. The written update covers done and next, so the live standup can be five minutes of blockers only.
How do you run a daily standup in 15 minutes?
Fifteen minutes is enough for a team of up to about eight people. The rules:
- Start on time, every time. Don't wait for latecomers or recap for them.
- Same order every day. Alphabetical, or by board column. No "who wants to go next?"
- About 90 seconds each. Use the template, two or three lines per heading.
- Park discussions. When two people start solving a problem, say "let's take that after" and note it. Only the people needed stay.
- Look at the board, not the manager. People should speak to the team. If they're reporting to one person, the standup has become a status meeting.
- End with blockers. Read back each one and its owner before you hang up.
If your standup still runs long with these rules, the team is probably too big. Split it, or move to async.
Should your standup be live or async?
Both work. The right choice depends on how your team works.
| Choose live when | Choose async when |
|---|---|
| The team shares most working hours | People are spread over several time zones |
| Work is tightly linked, like one sprint | People work on mostly separate tasks |
| The team is new and still building trust | The team is settled and writes clearly |
| Blockers need quick back-and-forth | Blockers can wait a few hours for an answer |
Many remote teams land on a mix: async updates every day, plus a short live call once or twice a week for anything that needs discussion. Our guide on how to manage remote teams covers a full weekly rhythm with updates, one-on-ones and team calls.
What makes a standup update useful?
The same day, written two ways:
Vague: Worked on the report. Some issues. Continuing today.
Useful: Finished the Q3 numbers in the client report, except churn. Blocked: the churn export from billing fails for October. Sam owns billing access. Today: churn section, then send the draft to Lee.
The useful version takes 30 more seconds and answers the questions a teammate would otherwise have to ask. A few habits get you there:
- Name the thing. "The Q3 report", not "the report".
- Say what done means. "Draft sent to Lee" is clearer than "worked on it".
- Make blockers specific. What's stuck, who can help, and since when.
- Skip the hours. A standup is about progress and problems, not time spent.
Common standup mistakes
- Turning it into a status report for the manager. It's a team planning check, not an audit.
- Solving problems in the meeting. Everyone else waits. Park it.
- Updates nobody reads. In async standups, if blockers get no reply, people stop posting them.
- Too many people. Past about eight, split the group.
- Changing the template every week. Pick one, run it for a month, then adjust.
How Astrolinks fits with a standup
Astrolinks doesn't run your standup. It helps with the written side. Each person keeps a private log of their workday on their own computer, and at clock-out the app drafts an end-of-day report with Done, Blockers and Tomorrow. They read it, edit it and send it. With the Team plan, reports land in one Team inbox, where managers see an Overview of who has sent and what's blocked. No screenshots, no keystroke logging. Those reports cover yesterday's done and today's plan before the standup starts, so the live call can stick to blockers. See end-of-day reports and Astrolinks for remote teams.